| 1 | MANDT | Client | MANDT | T000 | CLNT | 000003 | 000000 | |
| 2 | DISPR | Material: MRP profile | DISPR | | CHAR | 000004 | 000000 | |
| 3 | DISMM | MRP Type | DISMM | T438A | CHAR | 000002 | 000000 | |
| 4 | DISPO | MRP controller | DISPO | T024D | CHAR | 000003 | 000000 | |
| 5 | KZDIE | Indicator: MRP controller is buyer (deactivated) | KZDIE | | CHAR | 000001 | 000000 | |
| | |
|
| 6 | MAABC | ABC Indicator | MAABC | TMABC | CHAR | 000001 | 000000 | |
| 7 | PLIFZ | Planned delivery time in days | PLIFZ | | DEC | 000003 | 000000 | |
| 8 | DZEIT | In-house production time | DZEIT | | DEC | 000003 | 000000 | |
| 9 | FHORI | Scheduling Margin Key for Floats | FHORI | T436A | CHAR | 000003 | 000000 | |
| 10 | SBDKZ | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | | CHAR | 000001 | 000000 | |
| Possible Values 1 | Individual requirements only | 2 | Collective requirements only | | Individual and collective requirements |
| |
|
| 11 | KZBED | Indicator for Requirements Grouping | KZBED | | CHAR | 000001 | 000000 | |
| Possible Values T | Display of dependent requirements as a daily total | 0 | In rep. mfg, individual record in addn to total requirements |
| |
|
| 12 | EISBE | Safety stock | EISBE | | QUAN | 000013 | 000003 | |
| 13 | MINBE | Reorder Point | MINBE | | QUAN | 000013 | 000003 | |
| 14 | DISLS | Lot size (materials planning) | DISLS | T439A | CHAR | 000002 | 000000 | |
| 15 | BSTRF | Rounding value for purchase order quantity | BSTRF | | QUAN | 000013 | 000003 | |
| 16 | BSTMI | Minimum Lot Size | BSTMI | | QUAN | 000013 | 000003 | |
| 17 | BSTMA | Maximum Lot Size | BSTMA | | QUAN | 000013 | 000003 | |
| 18 | BSTFE | Fixed lot size | BSTFE | | QUAN | 000013 | 000003 | |
| 19 | MABST | Maximum stock level | MABST | | QUAN | 000013 | 000003 | |
| 20 | AUSSS | Assembly scrap in percent | AUSSS | | DEC | 000005 | 000002 | |
| 21 | LOSFX | Ordering costs | LOSFX | | CURR | 000011 | 000002 | |
| 22 | LAGPR | Storage costs indicator | LAGPR | T439L | CHAR | 000001 | 000000 | |
| 23 | AUFTL | Splitting Indicator | AUFTL | T439P | CHAR | 000001 | 000000 | |
| 24 | LGRAD | Service level | LGRAD | | DEC | 000003 | 000001 | |
| 25 | WEBAZ | Goods receipt processing time in days | WEBAZ | | DEC | 000003 | 000000 | |
| 26 | USEQU | Quota arrangement usage | USEQU | TMQ2 | CHAR | 000001 | 000000 | |
| 27 | PERKZ | Period Indicator | PERKZ | | CHAR | 000001 | 000000 | |
| Possible Values T | Daily | P | Period according to fiscal year variant | M | Monthly | | Initial value | W | Weekly |
| |
|
| 28 | PERIV | Fiscal Year Variant | PERIV | T009 | CHAR | 000002 | 000000 | |
| 29 | EKGRP | Purchasing group | EKGRP | T024 | CHAR | 000003 | 000000 | |
| 30 | MRPPP | PPC planning calendar | MRPPP | T439G | CHAR | 000003 | 000000 | |
| 31 | SAUFT | Ind.: Repetitive mfg allowed | SA_SAUFT | | CHAR | 000001 | 000000 | |
| | |
|
| 32 | SFEPR | Repetitive manufacturing profile | SFEPR | T437S | CHAR | 000004 | 000000 | |
| 33 | FXHOR | Planning time fence | FXHOR | | NUMC | 000003 | 000000 | |
| 34 | VRMOD | Consumption mode | VRMOD | | CHAR | 000001 | 000000 | |
| Possible Values 4 | Forward/backward consumption | 3 | Forward consumption only | 1 | Backward consumption only | 2 | Backward/forward consumption |
| |
|
| 35 | VINT1 | Consumption period: backward | VINT1 | | NUMC | 000003 | 000000 | |
| 36 | VINT2 | Consumption period: forward | VINT2 | | NUMC | 000003 | 000000 | |
| 37 | DISGR | MRP Group | DISGR | T438M | CHAR | 000004 | 000000 | |
| 38 | KAUSF | Component scrap in percent | KAUSF | | DEC | 000005 | 000002 | |
| 39 | ALTSL | Method for Selecting Alternative Bills of Material | ALTSL | | CHAR | 000001 | 000000 | |
| Possible Values | Selection by order quant. | 3 | Selection only by production version | 1 | Selection by explosion date | 2 | Selection by production version |
| |
|
| 40 | MISKZ | Mixed MRP indicator | MISKZ | | CHAR | 000001 | 000000 | |
| Possible Values 2 | Gross requirements planning | 3 | Subassembly planning without final assembly | 1 | Subassembly planning with final assembly |
| |
|
| 41 | WZEIT | Total replenishment lead time (in workdays) | WZEIT | | DEC | 000003 | 000000 | |
| 42 | VPMAT | Planning material | VPMAT | MARA | CHAR | 000018 | 000000 | |
| 43 | VPWRK | Planning plant | VPWRK | MARC | CHAR | 000004 | 000000 | |
| 44 | VPREF | Conv. factor f. plng material | VPREF | | CHAR | 000010 | 000000 | |
| 45 | TAKZT | Takt time | TAKZT | | DEC | 000003 | 000000 | |
| 46 | RWPRO | Range of coverage profile | RWPRO | T438R | CHAR | 000003 | 000000 | |
| 47 | LFRHY | Planning cycle | LFRHY | T439G | CHAR | 000003 | 000000 | |
| 48 | RDPRF | Rounding Profile | RDPRF | RDPR | CHAR | 000004 | 000000 | |
| 49 | STRGR | Planning strategy group | STRGR | T461P | CHAR | 000002 | 000000 | |
| 50 | SOBSL | Special procurement type | SOBSL | T460A | CHAR | 000002 | 000000 | |
| 51 | RGEKZ | Indicator: Backflush | RGEKM | | CHAR | 000001 | 000000 | |
| Possible Values 2 | Work center decides whether to backflush | 1 | Always Backflush |
| |
|
| 52 | SCHGT | Indicator: bulk material | SCHGT | | CHAR | 000001 | 000000 | |
| | |
|
| 53 | WAERS | Currency Key | WAERS | TCURC | CUKY | 000005 | 000000 | |
| 54 | SHFLG | Safety time indicator (with or without safety time) | SHFLG | | CHAR | 000001 | 000000 | |
| Possible Values 2 | Safety time for all requirements | 1 | Safety time for independent reqmts | | Ignore safety time |
| |
|
| 55 | SHZET | Safety time (in workdays) | SHZET | | NUMC | 000002 | 000000 | |
| 56 | MDACH | Action control: planned order processing | MDACH | T46AC | CHAR | 000002 | 000000 | |
| 57 | LGPRO | Issue Storage Location | LGPRO | T001L | CHAR | 000004 | 000000 | |
| 58 | MTVFP | Checking Group for Availability Check | MTVFP | TMVF | CHAR | 000002 | 000000 | |
| 59 | BESKZ | Procurement Type | BESKZ | | CHAR | 000001 | 000000 | |
| Possible Values X | Both procurement types | E | In-house production | F | External procurement | | No procurement |
| |
|
| 60 | KZECH | Determination of batch entry in the production/process order | KZECH | | CHAR | 000001 | 000000 | |
| Possible Values 3 | Automatic batch determination upon release of order | 1 | Manual batch determination required upon release of order | 2 | Batch not required in prod./process order; confirmation reqd | | Batch in goods issue; no confirmation required |
| |
|
| 61 | EISLO | Minimum Safety Stock | EISLO | | QUAN | 000013 | 000003 | |
| 62 | PLIFZX | Consider Planned Delivery Time of the MRP Area | MD_PLIFZ_DB | | CHAR | 000001 | 000000 | |
| Possible Values | Use Planned Delivery Time of the Plant | X | Use Planned Delivery Time of the MRP Area |
| |
|
| 63 | LGFSB | Default storage location for external procurement | LGFSB | T001L | CHAR | 000004 | 000000 | |